Proplant Scaffolding Ltd have been employed to provide a full perimeter access scaffold around 201 new residential homes as part of phase one of a brand new estate on Abbey Road, Barking.
The scaffold needs to provide full access to all floor levels on each of the four blocks to allow the construction of the new buildings. Proplant have designed the scaffold using system scaffold (Cuplok) to ensure we reduce the number of materials that can be dropped and ensure works are carried out to the highest Health and Safety standards.
By using system scaffold, this greatly reduces the number of fittings used on a project. We are also installing Combi Safe protection nets to ensure in the unfortunate event that something gets dropped, it will only go as far as the nets which will and protect other trades from accidental injury working below. The nets are raised progressively alongside the erection of the scaffold to ensure they are never more than 9m below the proceeding works.
Hoist gantries and scaffold loading bays are erected to each block to ensure all other trades can get their materials to each floor.
Location
Barking, London
Scope of Work
Client name: Wates
Projects Duration
7 years
Project Handover
2024
OUR PROJECTS